28 Bay Modular Classroom Block - Biggleswade

The school required increased accommodation for the upcoming academic year which included a number of classrooms, locker rooms and open plan learning spaces. The building also had to link to the existing building on both ground and first floor. We had a very tight space to work in.

Read More

- Read More -

Additional Space - Huntingdon

CP Composites required some extra space at their current facility, but due to the nature of the site there was only a very small footprint of space available. The unit had to provide power, heating and light, along with cooling as the windows could not be opened due to the nature of the works.

Read More

- Read More -

Main Site Office Complex - Canary Wharf

This two storey 6 on 6 modular building was refurbished and delivered to supply a main site office complex! Open plan offices, meeting rooms, kitchens and toilets featured in this big project of which our modular team started the refurbishment at our Alconbury depot and then completed at the clients Canary Wharf site.

Read More

- Read More -

Office and Canteen Set Up - London

One of our latest installs saw a two storey 16 bay modular being installed in London. The clients were residential house builders who were in need of a building to use on site as a canteen and office accommodation set up.

Read More

- Read More -

Satellite Office - Southport

This modular building was refurbished and delivered to supply a satellite office to our client. Open plan offices, meeting rooms, kitchens and toilets featured in this project which began on site at Alconbury in our depot and was finished over a period of time by our guys in Southport.

Read More

- Read More -

Day Nursery - Offord D'Arcy

We recently installed a 4 Bay Modular building for use as a nursery at a local school. The building was 9.6m x 12.6m and was refurbished on our site at Alconbury before being installed and finished at the clients site in Offord D’Arcy.

Read More

- Read More -

Temporary Church - Higham Ferrers

8 bay modular building installed locally for use as a church. The building was fully refurbished and installed as part of a full package supplied to the client. The building was a big project which again was completed successfully by our modular team. Another great install.

Read More

- Read More -

Nursery Block - Byfleet

One of our latest installs was a 4 bay nursery that was sourced, refurbished and installed for a customer in Byfleet. The building was 11.8m x 7.5m overall and featured a variety of facilities internally.

Read More

- Read More -

Community Shop - Alconbury Weald

A 3 bay clad modular building in the heart of the new housing developments at Alconbury Weald. Supplied by Modular GB to the clients standard to supply a small friendly shop. This building was refurbished, transported and sited by the Modular team. A huge success and a good feeling of helping out the neighbours in our local community!

Read More

- Read More -

Office & Training Centre London

A two storey Modular building providing high quality office accommodation. Comprising 8 no 10m x 3m refurbished modules forming 240m2 , installed in one day and completed two weeks later. The scope of works included full Mechanical and electrical installation with Air Conditioning, LED lighting and fire and intruder alarms.

Read More

- Read More -

Classroom Block - Cambridgeshire

This 800 sq mtr 26 bay modular building provided classroom and office facilities during a major rebuilding project over a 12 month period during the construction phase of a new building.

Read More

- Read More -

Community Centre - Cambridge

A 3 bay Modular building designed externally to fit in with existing buildings. The requirement was to hire the building for a 2 to 3 year period.

Read More

- Read More -

School Development - Lincolnshire

Very often in school renovation projects the initial problem is that of finding sufficient space in a suitable configuration to accommodate the 'temporary' class rooms whilst the permanent buildings are under renovation. In this example, the modular classrooms were erected on the car parking areas.

Read More

- Read More -

Corporate Headquarters - Bedfordshire

This 7 bay building was provided to offer high quality accommodation for management personnel. It included fully distributed underfloor IT services, air conditioning and all staff welfare services and facilities. The accommodation was needed in order to release the customer's existing buildings for production and storage services.

Read More

- Read More -

Football Club Social Centre Northamptonshire

This 6 bay modular building provides a social base for a local football club. It features a large 'Club House' with a floor suitable for dancing and general social events for the community. Toilet, kitchen, and bar facilities were also provided.

Read More